Skip to Content

Minnesota state highway projects

Construction projects, plans, and studies

Updated Dec. 10, 2021

Search for a project


2021 construction projects and interactive map

Browse by region

District Offices

MnDOT District 7 - Mankato/Windom Metro District - St Paul/Minneapolis MnDOT District 8 - Marshall/Wilmar/Hutchinson MnDOT District 1 - Duluth/Virginia MnDOT District 4 - Detroit Lakes/Morris MnDOT District 2 - Bemidji/Crookston MnDOT District 3 - Baxter/St Cloud MnDOT District 6 - Rochester/Owatonna

Browse by stage



Browse by highway number



Hwys 1–9

Hwys 1 and 59 — Thief River Falls

Construct 3 roundabouts on Hwy 1 at Brooks Avenue, Barzen Avenue and the intersection with Hwy 59

  • Construction dates: Summer 2020 - 2021

Hwys 1, 53 and 73 — Itasca and St. Louis counties

Resurface Hwy 1 from Hwy 65 to Hwy 53 and on Hwy 73 from Hwy 1 to Hwy 53 and intersection improvement at County Road 115/Ashawa Road north junction Hwy 1 in Itasca and St. Louis counties.

  • Construction dates: Work resumes in spring 2022
  • Traffic impacts: Lane closures

Hwy 2 — Bemidji

Reduced Conflict Intersections (RCI's) will be constructed on Hwy 2 between Beltrami County Road 14, in Wilton, and Beltrami County Road 9. 48 new LED lighting units will also be installed along the corridor to improve lighting and safety.

  • Construction scheduled for May-July 2021

Hwy 2 — Crookston

Resurface Hwy 2 from Hwy 9 to Hwy 32 east of Crookston

  • Construction scheduled for 2021

Hwy 2 — Cass Lake

Resurface Hwy 2 between Hubbard CR 46 and Hwy 371

  • Construction scheduled for 2021

Hwy 2 — Culvert replacements

Replace three box culverts along Hwy 2 between Proctor and Hwy 194.

  • West Rocky Run Creek, Midway River and Kingsbury Creek
  • Construction scheduled for 2024

Hwy 2 — Itasca

Repave 19 miles of Hwy 2 from Prairie River to two miles east of Hwy 65

  • Construction dates: 2021 to spring 2022
  • Traffic impacts: Detour

Hwy 2 — Saginaw

Construct a roundabout at the intersection of Hwy 2 and Hwy 194 in Saginaw

  • Construction scheduled for 2023

Hwy 2 — Cass Lake

Grade and resurface Hwy 2 East of Cass Lake to Cass County road 10.

  • Scheduled for construction in 2021

Hwy 2 — LaPrairie

Pavement rehabilitation, pedestrian, intersection, and ADA upgrades in the City of LaPrairie

  • Scheduled for construction in 2024

Hwy 2 — Marcoux Corner

A Reduced Conflict Intersection (RCI) is scheduled to be constructed on Hwy 2 at the intersection with Hwy 32 near Marcoux Corner.

  • Scheduled for construction in 2021

Hwy 2 Corridor Study — Fosston

The City of Fosston is conducting a corridor study to evaluate the transportation and pedestrian needs of Highway 2 in Fosston.

  • 2020-2021

Hwy 3 — Rosemount to Farmington

Evaluate the Hwy 3 corridor from 160th Street in Rosemount to Second Street in Farmington in order to identify possible improvements to improve safety, on Hwy 3 for motorists, pedestrians and bicyclists.

  • Study dates: February through December 2021

Hwy 4 — Meire Grove

Reconstructed and improved pedestrian access from Second Avenue South to Second Avenue North in Meire Grove, Stearns County.

  • Status: Completed

Hwy 4 — Sherburn to St. James

Resurface approximately 25 miles of Hwy 4 between Sherburn and St. James; replace and repair bridges; improve pedestrian accommodations in Sherburn and Trimont

  • Scheduled for construction in 2023-2024

5th Avenue West Bridge study

The goal of this study is to jump start the MnDOT scoping process for a future bridge project on the 5th Avenue West Bridge over I-35

  • October 2021 - June 2022

Hwy 5/Minnehaha Avenue and Stillwater Road — St. Paul to Maplewood

Safety, maintenance and accessibility improvements are needed on Hwy 5/Minnehaha Ave. and Stillwater Rd. from North Mendota St. to Century Ave. in St. Paul and Maplewood. The project will include repaving, maintenance, sidewalk repairs, and accessibility for all.

  • Construction: July 2023 through November 2025

Hwy 5/East 7th Street and Hwy 61/Arcade Street — St. Paul

Safety and accessibility improvements are needed on Hwy 5 and Hwy 61 from I-94 to Roselawn Ave. in St. Paul. The project will include repaving, sidewalk repairs, and accessibility for all.

  • Construction: April 2024 through October 2025

Hwy 5 — Saint Paul

Replaced joints and sidewalk on the bridge south of Hwy 61 over the BNSF and CP railroads.

  • Status: Completed

Hwy 6 — Itasca County

Resurfaced 10 miles of Hwy 6 from the Cass/Itasca county line to Hwy 2 west of Cohasset; replaced pipes and reconstructed the access at Itasca County Road 11.

  • Status: Completed

Hwy 6 — Remer

Reconstruct or resurface Hwy 6 (Main St./Hwy 200) from the east and west intersections of Hwy 6 and Hwy 200, through Remer, Cass County.

  • Scheduled for construction in 2022

Hwy 7 — Intersection study

Study of the intersection of Hwy 7 and County Road 15/24th Street in Montevideo

  • Study dates: October 2021 - January 2022

Hwy 7 — Lester Prairie

Construct roundabout at the intersection of Hwy 7 and McLeod County Road 1

  • Scheduled for construction in 2023

Hwy 7 — Minnetonka

Added a second left turn from Hwy 7 to Hopkins Crossroad and replaced traffic signal.

  • Status: Complete

Hwy 7 — Minnetonka to Shorewood

Repaving Hwy 7 and several other improvements.

  • Construction: July 2021 through July 2022
  • Traffic impacts: Road and lane closures

Hwy 7 — Safety Study

A safety study of Hwy 7 from just east of Hutchinson to County Road 9 in Lester Prairie.

  • Status: Study Completed

Hwy 7 — St. Louis Park to Hollywood

Conduct a traffic safety investigation on Hwy 7 from Hwy 100 in St. Louis Park to Carver Co. Rd. 33 in Hollywood to determine if the number and severity of crashes is abnormal, determine the primary factors for the crashes, and propose short-, medium-, and long-term updates to improve the safety of the highway.

  • Study: November 2021 through June 2022

Hwy 8 — Chisago City

The project work improved safety by constructing a dedicated left turn lane on Hwy 8 at Deer Garden Lane.

  • Status: Completed

Hwy 8 — Chisago City

Constructed dedicated left turn lane for eastbound traffic and added rural lighting at Hwy 11

  • Status: Completed

Hwy 8 — Forest Lake to Lindstrom

Installed fiber optic cable and cameras from I-35 in Forest Lake to Akerson Street in Lindstrom

  • Status: Completed

Hwy 8 — Chisago County

Safety and Mobility Improvement study to identified potential needs on Hwy 8 between I-35 and County Road 80 in Chisago County.

  • Studying preliminary design

Hwy 8 — Wyoming and Chisago City

Study identified possible future improvements to the Hwy 8 Corridor between Greenway Avenue North and Karmel Avenue.

  • Study completed; no projects have been funded or are currently planned

Hwy 9 — Barnesville to I- 94

Resurfacing, turn lanes, utility replacement, sidewalk improvements, trail, bicycle & ADA accessibility upgrades.

  • Scheduled for construction in 2023

Hwy 9 — New London

Addition of safety improvements for people who walk and bike

  • Scheduled for construction in 2022

back to top

Hwys 10–19

Hwy 10 — Anoka interchange

Construct new interchange at Thurston Avenue, build underpass at Fairoak Avenue and extend West Main Street; Remove all Hwy 10 access in project area.

  • Scheduled for construction in 2022-2023

Hwy 10 — Ramsey

Construct new interchanges on Hwy 10 at Ramsey Blvd. and Sunfish Lake Blvd. including bridges over the BNSF Railroad tracks. Build a frontage road between Ramsey Blvd. and Sunfish Lake Blvd.

  • Scheduled for construction in 2023

Hwy 10 — Anoka Rum River Bridge replacement

Replace Hwy 10 bridge over the Rum River; Additional funding being sought to reconstruct Ferry Street (Hwy 47/Hwy 169) interchange and build auxiliary lanes from Ferry Street to Seventh Avenue.

  • Scheduled for construction in 2022

Hwy 10 — Anoka

Installed temporary ramps to and from eastbound Hwy 10 and Hwy 47, and provided left turn lanes on northbound and southbound McKinley Street.

  • Status: Completed

Hwy 10 at Round Lake Boulevard — Coon Rapids

Replaced signal system, realigned loop from northbound Round Lake Boulevard to westbound Hwy 10, repaired bridges and resurfaced approach roads. Added ADA-compliant sidewalks.

  • Status: Completed

Hwy 10 — Elk River

Reconstructed both directions of Hwy 10 from Xenia Avenue to Lowell Avenue in Elk River, included sidewalks, multi-use trail and signal systems.

  • Status: Completed

Hwy 10 and CR 60 — Reduced Conflict Intersection

MnDOT will improve access and safety at the Highway 10 and County Road 60 intersection in Otter Tail County by implementing a Reduced Conflict Intersection (RCI).

  • Scheduled for construction in 2024

Hwy 10 — Randall

Improve access and safety on Hwy 10 in Randall, which includes two proposed Reduced Conflict Intersections (RCI) at Morrison Co. Rd. 14 and Hwy 115.

  • Scheduled for construction in 2024

Hwy 10 — Wadena

Expand six miles of Hwy 10 from two to four lanes from east of Wadena at 620th Avenue, Otter Tail County, to west of Wadena at Oink Joint Road, Wadena County.

  • Scheduled for construction in 2025-2026

Hwy 12 — Delano to Independence

Explore options to improve safety on Hwy 12 between Hennepin Co. Rd. 90 in Independence and Co. Line Rd. in Delano.

  • Study: February 2021 to February 2022

Hwy 12 — Howard Lake

Resurface the road and make pedestrian updates on Hwy 12 between 13th Avenue and Sixth Avenue in Howard Lake, Wright County.

  • Scheduled for construction in 2023

Hwy 12 — Orono to Independence

Improve safety and reduce crashes along Hwy 12, install a center concrete barrier, and construct a roundabout

  • Construction: Spring 2021 through September 2022

Hwy 12 — Ortonville to Hwy 59

Resurface, widen shoulders, improve blowing/drifting snow traps, and replace box culverts.

  • Construction: May to October 2021

Hwy 12 — Willmar

Resurfacing of Hwy 12 from Sixth Street East to 24th Street in Willmar

  • Status: Completed

Hwy 12 — West of Willmar

Resurfacing of Hwy 12 from Pennock to the bridge 1 mile east of Country Road 5 in Willmar.

  • Status: Completed

Hwy 13 — Montgomery

Resurface Hwy 13 through the City of Montgomery; construct at roundabout at the intersection with Le Sueur County Road 28

  • 2023 construction

Hwy 13 — Savage to Burnsville

Study of Hwy 13 between Hwy 169 in Savage and Nicollet Avenue in Burnsville.

  • Study in progress; scheduled for construction in 2022

Hwy 13 — Spring Lake and Cedar Lake

Resurface and reconstruct road between Hwy 19 in Cedar Lake Township to Hwy 282 in Spring Lake Township and add left turn lanes.

  • Construction: Spring through fall 2022

Hwy 14 — Riverfront Drive in Mankato

Construct two tear drop roundabouts at all exit and entrance ramps along Hwy 14 at Riverfront Drive, along with improvements at the adjacent city and county connections. This is a Blue Earth County led project

  • Status: Completed

Hwy 14 — Sanborn to Springfield

Resurface over 8 miles of Hwy 14 from the west side of the Sanborn Four Corners intersection to the eastern city limits of Springfield

  • 2022 construction

Hwy 14 — Rochester to Byron

Evaluate 3 intersections in the Hwy 14 corridor for modifications to improve safety between Rochester and Byron.

  • Scheduled for construction in 2022

Hwy 15 — Kimball

Reconstruct Hwy 15 from Willow Creek Park, south of the railroad tracks, to Hwy 55 in Kimball, Stearns County, includes pedestrian sidewalks and city utilities.

  • Scheduled for construction in 2022

Hwy 15 — Madelia

Resurface the concrete for about seven miles of Hwy 15 from the north Hwy 15/Hwy 60 interchange to the Watonwan/Brown County line near Madelia

  • 2022 construction

Hwy 15 and Hwy 60 — Madelia

Replace the pavement for about seven miles of Hwy 15/Hwy 60 from the south Hwy15/Hwy60 interchange to the north Hwy15/Hwy60 interchange near Madelia. Both the northbound and southbound lanes will be updated.

  • 2022 construction

Hwy 19 — Cannon Falls repaving

Repaving, possible replacement of the traffic signal at the intersection of Hwy 19 and Hwy 20 along with ADA sidewalk improvements.

  • Scheduled for construction in 2022

Hwy 19 — Henderson

Extend the lowest point of Hwy 19 (east of Henderson) to offset impacts to the floodway when Hwy 93 is raised. This Hwy 19 work between the Minnesota River Bridge and railroad bridge will take place in 2022, in advance of Hwy 93 construction starting in 2023

  • 2022 construction

Hwy 19 — New Prague

Reconstruct Hwy 19 in downtown New Prague (city-led project)

  • Status: Completed

Hwy 19 — Winthrop

Replace the box culvert under Hwy 19, just east of Winthrop, and reconstruct a short section of pavement

  • 2022 construction

back to top

Hwys 20–29

Hwy 21 — Jordan

Construct a roundabout at Hwy 21 and Sawmill Road/Old Hwy 169 and build trails to connect to existing trails.

  • Construction: Spring 2022 through fall 2023

Hwy 22 — Mankato to St. Peter

Reconstruct roadway from Mankato to St. Peter; construct roundabouts at August Dr. in Mankato and CR 21 in Kasota; build a new walking and biking trail to connect Mankato and St. Peter

  • 2024 construction

Hwy 22 — Mapleton to Wells

Resurface Hwy 22 from approximately a quarter of a mile south of Mapleton to the north city limits of Wells, including the Hwy 22/Hwy 109/Faribault County Road 29 intersection

  • 2023 construction

Hwy 22 and Hwy 109 – Wells

Reconstruct Hwy 22 through the City of Wells, as well as Hwy 109 from west of Rose Hill Cemetery to Hwy 22; replace utilities

  • 2026 construction

Hwy 23 — Deer Creek Bridge

Replace Deer Creek Bridge on Hwy 23 just south of Pleasant Valley in Carlton County

  • Construction dates: Work resumes in spring 2022
  • Traffic impacts: Lane closures

Hwy 23 — Foley to Milaca

Resurface and improve 12.5 miles of road from Foley to Milaca, includes underground pipes/culverts, intersection turn lanes/access. Reconstruct one mile of road in Foley, includes storm sewer, pedestrian sidewalk/multi-use trail and new roundabout.

  • Scheduled for construction in 2022

Hwy 23 — Fond du Lac

New road connection from Hwy 23 to Fourth Street in Fond du Lac

  • Scheduled for construction in 2022
  • Traffic impacts: Lane closures

Hwy 23 — Gaps

Expand Hwy 23 to four lanes from New London to Paynesville (South Gap) and Paynesville to Richmond (North Gap).

  • North Gap: Scheduled for construction in 2022-2023
  • South Gap: Scheduled for construction in 2023-2024

Hwy 23 — Milaca

Improve and update Hwy 23 through Milaca in Mille Lacs County, includes the road surface, drainage, multi-use access and sidewalks.

  • Scheduled for construction in 2025

Hwy 23 and Hwy 10 — St. Cloud interchange

Reconstruct and improve the Hwy 10 and Hwy 23 interchange area in east St. Cloud, Benton County, includes the road surface, bridges, drainage structures, pedestrian and motorist access.

  • Scheduled for construction in 2023-2024

Hwy 25 — Brainerd

Replace the Hwy 25 bridge over the Burlington Northern Santa Fe (BNSF) Railway line in Brainerd, Crow Wing County, includes multi-use trail.

  • Construction: 2023
  • Impacts: Detour

Hwy 25 — Buffalo to Monticello

Resurface Hwy 25, from near Catlin Street in Buffalo to near CR 106/85th Street south of Monticello.

  • Scheduled for construction in 2026

Hwy 25 — Buffalo

Reconstruct Hwy 25 from south of First Street South to north of Settlers Parkway Buffalo, Wright County, includes city utilities and pedestrian sidewalks and approaches.

  • Scheduled for construction in 2023

Hwy 25 — Watertown and Mayer

Resurfaced Hwy 25 south of County Road 30 in Mayer to State St in Watertown, updated drainage and sidewalks to meet current American with Disability Standards (ADA).

  • Status: Completed

Hwy 25 — Mayer and Norwood Young America

Repaved Hwy 25 between First Street in Mayer and Hwy 5 in Norwood Young America, repaired drainage, improved sidewalks south of First Street in Mayer and make accessibility updates.

  • Status: Complete

Hwy 27 — Wahkon

Community invited to 'try-out' potential walk, bike opportunities at a demonstration project set-up in Wahkon, Mille Lacs County. Includes: Curb extensions, narrowed road and bike lanes on both sides of road.

  • Status: Completed

Hwy 27 — Osakis area

Reconstruct and improve Hwy 27 between I-94 in Douglas County and Hwy 71 in Todd County. The project will replace four bridges, reconstruct and widen the road and improve access.

  • Scheduled for construction in 2022

Hwy 29 — Alexandria

Planning study to identify future highway improvements that will enhance traffic performance, mobility and driver satisfaction.

Hwy 29 — Glenwood overpass

Construct bridge over the railroad tracks just north of Glenwood, realign the intersection of Hwy 29 and Hwy 55

  • Construction: July to October 2021; May to October 2022

back to top

Hwys 30-39

Hwy 30 — Ellendale

Repave Hwy 30 from 0.28 miles west of Ellendale to 1 mile east of County Road 45

  • Status: Completed

Hwy 33 – Cloquet RCUT

Construct a Restricted Crossing U-turn (RCUT) at the intersection of Hwy 33 and Gillette Road.

  • Scheduled for construction in 2022

I-35 — Barnum overlay

Overlay on 6.2 miles of northbound I-35 near Barnum.

  • Northbound exit into Barnum will be detoured
  • Construction scheduled for 2022

I-35 — Striping

Restriping northbound and southbound lanes: centerline and shoulders in Scott, Rice and Freeborn counties

  • Status: Completed

I-35E — Columbus

Installed cable median barrier from the I-35/35E/35W split to Hwy 97

  • Status: Completed

I-35E — Eagan

Replace lighting between Diffley Road and Lone Oak Road

  • Construction: September 2021 through March 2022
  • Traffic impacts: Possible lane, ramp and shoulder closures

I-35E — Eagan

Update signals and accessibility at Cliff Road to meet current standards.

  • Construction: September 2021 through March 2022
  • Traffic impacts: Possible lane, ramp and shoulder closures

I-35E — Eagan standalone noise barrier

Constructed new 3,500 foot long, 20 foot tall concrete noise barrier near northbound I-35E between the Hwy 77 ramps and just south of Cliff Road in Eagan

  • Status: Completed

I-35E and I-94 — Saint Paul

Concrete pavement repair/resurfacing between Western Avenue and Mounds Boulevard; and on I-35E between I-94 and University Avenue in St. Paul. Resurface ramps and frontage roads, bridge repair, fix drainage and repair various sidewalks and ADA improvements

  • Construction: Summer 2021 through fall 2022

I-35E — Saint Paul

Installed landscaping between University Avenue and Wheelock Parkway

  • Status: Completed

I-35W — Bloomington

Resurface I-35W with additional lanes added between 98th St. and 106th St. Five intersections will receive improved ramps, sidewalks and signals.

  • Construction dates: May through October 2023

I-35W — Minneapolis

Crews will build six stormwater storage tanks east of northbound I-35W between 40th St. and 42nd St.

  • Construction dates: February 2020 through June 2023
  • Traffic impacts: Overnight lane closures of northbound I-35W; short-term closures of Second Avenue

I-35W — Minneapolis St. Anthony Falls Bridge

Crews made improvements to seal cracks in concrete driving surface, concrete barrier and curbs; replaced expansion joints.

  • Status: Completed

I-35W — North Gateway Study

Study the freeway between Park Avenue in Minneapolis and County Road C in Roseville to identify needs for future construction projects.

  • Study in progress

I-35W — Roseville to Lino Lakes

Constructed MnPASS Express Lanes (one lane in each direction) in the middle of existing I-35W between Hwy 36 in Roseville and Sunset Avenue (County Road 53) in Lino Lakes

  • Status: Completed

Hwy 36 — Little Canada to Stillwater

Updated culverts in various locations between I-35E in Little Canada and Stillwater Boulevard in Stillwater.

  • Status: Completed

Hwy 36 — Little Canada to Stillwater

A 12-mile stretch of Hwy 36 between Edgerton Street in Ramsey County and Greeley Street in Washington County will undergo a road resurfacing and improvement project.

  • Construction: Spring through fall 2022

Hwy 36 — Stillwater Lift Bridge

The Hwy 36 Stillwater Lift Bridge is located on Chestnut St. in downtown Stillwater. The lift span is operated by the Minnesota Dept. of Transportation. The regular season is from May 15 through Oct 15 each year.

  • Status: Completed

Hwy 36 — Stillwater to Minneapolis

The Hwy 36 Transit Feasibility Study will analyze existing and emerging needs for east-west transit service on Hwy 36. The study is led by Washington County.

  • Study dates: Spring 2020 through spring 2021

Hwy 36 and Fairview Avenue — Roseville

Rebuild and realign the ramps at westbound Hwy 36 and Fairview Avenue in Roseville. Add ADA-compliant sidewalks.

  • Construction: Spring through summer 2023

Hwy 37 — Iron Junction

Construct a roundabout at the intersection of Hwy 37 and Hwy 7 south of Iron Junction

  • Scheduled for construction in 2022

Hwy 37 — Gilbert

Resurfacing, safety and accessibility improvements on Hwy 37 from Hwy 53 to Hwy 135

  • Status: Completed

Hwy 38 — Bigfork

Resurface Hwy 38 through Bigfork, from Rajala Mill Road to County Road 14; curb, gutter and sidewalk work

  • Scheduled for construction in 2023

back to top

Hwys 40-59

Hwy 40 — Milan Bridge

Replace bridge (known as Milan Bridge) over Lac qui Parle Lake west of Milan.

  • Status: Completed

Hwy 41 — Chaska to Chanhassen

Resurface Hwy 41 and make additional improvements along the highway between Pioneer Trail and Hwy 5.

  • Construction: Spring through fall 2023

Hwy 41 — River crossing

Connect Hwy 169 and new Hwy 212 near Hwy 41

  • Study complete; no projects have been funded or planned

Hwy 43 — Repaving

Repave Hwy 43 from Hwy 44 near Mabel to Hwy 16 near Rushford in Fillmore County

  • Scheduled for construction in 2023

Hwy 43 — Winona

Reconstruction of .5 mile of Hwy 43 (Mankato Ave.) from Sarnia St. to south of Hwy 61. Improvements are planned for key intersections along Hwy 43: Sarnia St., Frontenac Dr., Riverbend Rd., Bruski Dr. and Hwy 61/Hwy 14.

  • Scheduled for construction in 2022

Hwy 47 — St. Francis

MnDOT is beginning a planning study of the Hwy 47 St. Francis corridor to examine a range of alternatives to address pedestrian, bicycle and motorist safety, as well as road capacity, and access and mobility issues.

Hwy 47 and Hwy 65 — Columbia Heights to Coon Rapids

Conducted a roadway safety audit to analyze crash information with a focus on pedestrian crashes on Hwy 47 and Hwy 65 between the Hennepin-Anoka County line in Columbia Heights and Hwy 10 in Coon Rapids. Several improvements are being made to the project area.

  • Construction dates: Spring 2020 through fall 2021

Hwy 47 and Hwy 169 — Anoka

Repaired and resurfaced approximately 2.5 miles of Hwy 169 between the north end of the Mississippi River bridge to Clay Street in Anoka. Hwy 47 was resurfaced from Pleasant Street to Bunker Lake Road in Anoka.

  • Status: Complete

Hwy 51 (Snelling Avenue) — Roseville

Updated signals and accessibility at County Road C2 and Roselawn Avenue to meet current standards.

  • Status: Completed

Hwy 52 — Zumbrota to Cannon Falls

The project follows along Hwy 52, from roughly 2 miles south of Cannon Falls and ends at Zumbrota.

  • Scheduled for construction in 2021

Hwy 52 — Hampton to Cannon Falls

Crews made improvements to Hwy 52 between Hampton Twp. and Cannon Falls in Dakota County. Work included construction crossovers, concrete overlay, upgraded guardrail, installed cable median barrier, updated signals and repaired joints on two bridges.

  • Status: Completed

Hwy 52 — Inver Grove Heights

Replaced lighting at Upper 55th Street, 70th Street and 80th Street

  • Status: Complete

Hwy 52 — Rosemount to Hampton

Resurface Hwy 52 between Co. Rd. 42 in Rosemount and Co. Rd. 86 in Hampton. Work will include constructing crossovers, repairing drainage and installing signs.

  • Construction: Spring 2023 through fall 2024

Hwy 53 — International Falls

Reconstruct Hwy 53 from Crescent Drive to Fourth Street and on Hwy 11 from the east junction of Hwy 71 to the east junction of Hwy 53 in International Falls in St. Louis County; complete streets improvements

  • Construction dates: July to October 2020, and May to October 2021
  • Traffic impacts: Lane closures, local detours

Hwy 53 — Intersection revisions

New turn lane and median removal at Hwy 53 intersections at Miller Trunk Road and at Bodas Road / East Long Lake Road.

  • Status: Completed

Hwy 53 — Intersection improvements

Adding a southbound median left turn lane on Hwy 53 at P&H Road, widening the median crossover, and paving a portion of P&H Road.

  • Scheduled for construction in 2022

Hwy 53 — Pike Lake

Resurface Hwy 53 southbound from County Road 13 to County Road 8

  • Status: Completed

Hwy 55 — Brooten, Belgrade

Reconstructed Hwy 55 through the cities of Brooten and Belgrade, Stearns County, included road surface, storm sewer and pedestrian sidewalks.

  • Status: Completed

Hwy 55 — Golden Valley

Resurfaced Hwy 55 between General Mills Boulevard and Hwy 100 in Golden Valley; improved safety and accessibility; built the start of a trail between Winnetka Avenue and Glenwood Avenue

  • Status: Completed

Hwy 55 — Hastings to Inver Grove Heights

The Hwy 55 Safety Audit was part of a multi-agency effort to improve safety along Hwy 55 between Hastings and Inver Grove Heights in Dakota County

  • Study completed

Hwy 55 — Plymouth to Golden Valley

Resurface Hwy 55 between Old Rockford Road in Plymouth and General Mills Boulevard in Golden Valley.

  • Construction: June 2024 through July 2025

Hwy 55 — Minneapolis

Crews will resurface Hwy 55/Hiawatha Ave. between I-35W and Hwy 62, repair bridges from Hwy 55 to 7th St., 8th St. to Hwy 55 and SB Hwy 55 over Franklin Ave.

  • Construction: April through November 2022

Hwy 55 — Minneapolis

Remove/replace pavement on Hwy 55 between Van White Memorial Blvd. and North Bryant Ave. in Minneapolis. Project work also includes removal of the Bassett Creek tunnel and bridge repairs.

  • Construction: July 2022

Hwy 55 (Hiawatha) — Minneapolis storm sewer project

Repaired storm sewer pipe that takes water from Hwy 55 in Minneapolis to the Mississippi River.

  • Status: Completed

Hwy 55 — Rosemount

Construct dedicated turn lanes at the intersection of Hwy 55 and Doyle Path in Rosemount

  • Construction: Spring through fall 2022

Hwy 56 — LeRoy

Reconstruction of roadway, base, pedestrian facilities, drainage and city utilities.

  • Scheduled for construction in 2023

Hwy 57 — Kasson

Reconstruction of Hwy 57 in Kasson

  • Scheduled for construction in 2022

Hwy 59 and Hwy 108 — Pelican Rapids

Downtown Complete Streets reconstruction, resurface, utility replacement, bicycle and pedestrian accessibility improvements.

  • Scheduled for construction in 2024

Hwy 59 — Winger

Resurface Hwy 59 from Winger to Erskine and improve pedestrian crossings in Winger

  • Scheduled for construction in 2021

back to top

Hwys 60-79

Hwy 60 — Lake Crystal

Reconstruct Hwy 60 from west of the south junction with Blue Earth County Road 20 to east of Lakeview Road; replace utilities; construct a pedestrian train along the south side of Hwy 60 from Cemetery Road to Lakeview Road

  • 2025 construction

Hwy 60 — Madelia to Lake Crystal

Resurface the eastbound lanes of Hwy 60 from the northern junction of Hwy 15 near Madelia to 0.4 miles west of the western junction of Blue Earth County Road 20 near Lake Crystal

  • Status: Completed

Hwy 60 — Windom Corridor Study

Hwy 60 through the City of Windom is being studied to create a long-term vision for the corridor that incorporates community values, economic development, safety, and bicyclists and pedestrians

Hwy 60 — Worthington roundabouts

Reconstruct the inside curb of three roundabouts in Worthington on Hwy 60 at the intersections of Oxford St., I-90, and Nobles County Road 35

  • Status: Completed

Hwy 61 — Grand Marais

Reconstruct, resurface Hwy 61 in Grand Marais, accessibility, drainage improvements from just north of Cutface Creek to just north of Hwy 14 in Grand Marais in Cook County

  • Status: Completed

Hwy 61 — Grand Portage

Resurfacing and bridge project from Reservation Bay Road to the Canadian Border in Cook County

  • Status: Completed

Hwy 61 — Maplewood

Replaced or repaired culverts from County Road B and Arcade Street

  • Status: Complete

Hwy 61/Arcade Street and Hwy 5/East 7th Street — St. Paul

Safety and accessibility improvements are needed on Hwy 5 and Hwy 61 from I-94 to Roselawn Ave. in St. Paul. The project will include repaving, sidewalk repairs, and accessibility for all.

  • Construction: April 2024 through October 2025

Hwy 61 Wabasha to Minnesota City

Resurfacing southbound lanes, constructing a reduced conflict intersection at Hwy 42 and replacing approach panels on six bridges

  • Scheduled for construction in 2022

Hwy 61/Hwy 316 roundabout

Constructing a roundabout at intersection, improving bicycle facilities, connections near Prairie Island Indian Community

  • Scheduled for construction in 2022

Hwy 61 — Lake County

Install new efficient tunnel lighting systems

  •  Scheduled for construction in 2024

Hwy 61 — Two Harbors

Resurface almost seven miles of pavement south of Two Harbors, new intersection

  • Status: Completed
  • Traffic impacts: lane closures

Hwy 61 — Forest Lake to Wyoming

Resurfaced Hwy 61 between Hwy 8 in Forest Lake and I-35 in Wyoming. The work included pavement work, drainage updates, right turn lanes, safety and pedestrian improvements.

  • Status: Completed

Hwy 63 and I-90 — Stewartville

Interchange improvements including replacement of the Hwy 63 bridges, and safety and vehicle traffic capacity improvements to the ramp geometrics and traffic operations within the corridor.

  • Status: Completed

Hwy 64 — Akeley

Install larger box culvert at Eleventh Crow Wing Lake on Hwy 64 north of Akeley.

  • Construction dates: August-October 2021

Hwy 65 — Mora

Reconstruct the Hwy 65 (Hwy 23) bridge over the Snake River south of Division Street in Mora, Kanabec County, includes new multi-use trail.

  • Scheduled for construction in 2022

Hwy 65 — Resurfacing project

Repave 42.59 miles of alternating sections of Highway 65 from the north junction of Highway 1 to 0.5 mile south of Highway 8 in Itasca County and Koochiching County.

  • Construction: 2022
  • Traffic impacts: Detour on portions of the project

Hwy 65 — Ham Lake to East Bethel

Several crashes occurred at this RCI intersection in spring and summer 2020, and some are still under review by the State Patrol. In the meantime, MnDOT engineers are reviewing all available historical crash data to identify patterns, and will be taking short term steps to enhance safety of the intersection. MnDOT continues to work closely with the City of East Bethel and Anoka County to understand the community's needs and concerns.

  • Status: Project completed in August 2019. Re-evaluation opened in August 2020.

Hwy 65/Third Avenue Bridge — Minneapolis

The Hwy 65/Third Avenue bridge will get major renovation improvements including a new bridge deck.

  • Construction dates: May 2020 through August 2022
  • Traffic impacts: Lane and bridge closures

Hwy 67 — Clarkfield

Reconstruction of Hwy 67 from Hwy 59 to Sixth Street

  • Scheduled for construction in 2024

Hwy 71 & Hwy 29 — Wadena

Resurface or reconstruct segments of road, upgrade signal systems, improve pedestrian sidewalks and ramps in Wadena, Wadena County. Includes underground city utilities and storm sewer on Hwy 71 from Birch Avenue North to Elm Avenue North.

  • Scheduled for construction in 2025-2026

Hwy 71 — Browerville

Replace Hwy 71 bridges over the Drayer Creek and Harris Creek in Browerville, Todd County.

  • Construction: 2022
  • Impacts: Detour

Hwy 71 — Olivia

Resurfacing of Hwy 71 from Viking Drive to the intersection of Hwy 212 in Olivia

  • Scheduled for construction in 2022

Hwy 71 — Sauk Centre

Reconstruct and improve safety on Hwy 71 in Sauk Centre, Stearns County.

  • Scheduled for construction in 2026

Hwy 73 — Chisholm

Resurface Hwy 73 from Hwy 169 to 13th Street NW/McNiven Road

  • Scheduled for construction in Summer 2027

Hwy 73 — Railroad bridge

Rehabilitate the Hwy 73 bridge over the BNSF Railroad on Hwy 73, 2.5 miles south of Hwy 169 in Saint Louis County

  • Status: Completed

Hwy 75 — Hallock

Resurface Hwy 75 and make pedestrian accommodations.

  • Scheduled for construction in 2022-2023

Hwy 77 — Apple Valley

Replace lighting at McAndrews Road and 127th Street

  • Construction: February through August 2022
  • Traffic impacts: Possible lane, ramp and shoulder closures

Hwy 77 — Bloomington

Made repairs and painted bridge over the Minnesota River.

  • Status: Completed

Hwy 77 — Bloomington to Minneapolis

Hwy 77 will be resurfaced, improve drainage, improve accessibility and center media barrier added.

  • Construction: April through November 2022
  • Traffic impacts: Road, lane and ramp closures

Hwy 77 — Richfield

Build underpass beneath Hwy 77 connecting 77th Street in Richfield to 66th Street; build ramps, build trail, sidewalk.

  • Construction: Spring 2021 through fall 2022

back to top

Hwys 80-99

Hwy 84 — Pine River

Replaced the Hwy 84 bridge over the Norway Brook in Pine River, Cass County. The new structure has pedestrian sidewalks on both sides and shoulders for bicyclists.

  • Status: Completed

Hwy 86 — Lakefield

Reconstruct Hwy 86 through the City of Lakefield; upgrade wastewater and water systems

  • 2022 construction

Hwy 87 — Frazee Complete Streets

Downtown Complete Streets reconstruction, resurface, utility replacement, ADA improvements and multi-use trail.

  • Scheduled for construction in 2022

I-90 — Luverne to Beaver Creek

Nine miles of westbound I-90 from Beaver Creek to the Rock River in Luverne will be resurfaced

  • June to September 2021 construction

I-90 and Hwy 63 — Stewartville

Interchange improvements including replacement of the Hwy 63 bridges, and safety and vehicle traffic capacity improvements to the ramp geometrics and traffic operations within the corridor.

  • Status: Completed

Hwy 93 — Henderson

Raise Hwy 93 from the intersection of Hwy 169 to the southern limits of Henderson, putting it above the 100-year flood elevation

  • 2022 and 2023 construction

I-94 — Alexandria

Interchange planning study to develop various concepts to apply for funding and to have approved concepts ready to submit to FHWA for approval.

  • Status: Study

I-94 — East Metro Interchange study (I-694/I-494/I-94)

This study focuses on finding the long-term vision for the I-94/I-494/I-694 interchange while ensuring that other projects in the interchange area are compatible with that vision.

  • Study dates: 2019 through summer 2021

I-94 — Maple Grove to Clearwater

Resurface road, replace/construct bridges, add lanes and improve access

  • Construction dates: August 2019 through fall 2021
  • Traffic impacts: All lanes will remain open during construction with lane restrictions on nights or weekends. Special consideration is being made to keep Friday evening weekend rush hour lanes open.

I-94 and I-394 — Minneapolis

Repair bridge joints and resurface ramps connecting I-94 and I-394 to downtown Minneapolis.

  • Construction: April 2021 through spring 2022

I-94 — Oakdale to Lakeland

Resurface I-94 between Hwy 120/Century Ave. and the St. Croix River. Additional work includes constructing a new eastbound lane from I-494 to Woodbury Dr., repair drainage, replace signage, upgrade lighting, install median barrier and more improvements along the project area.

  • Construction dates: Fall 2022 through late fall 2024

I-94 — Rethinking Minneapolis to Saint Paul

MnDOT, along with FHWA, Ramsey & Hennepin Counties and the cities of Saint Paul and Minneapolis, are preparing a Tiered Environmental Impact Statement for the Rethinking I-94 effort. Rethinking I-94 intends to reconnect neighborhoods, revitalize communities and ensure residents have a meaningful voice in transportation decisions that affect their lives.

  • Environmental review underway

I-94 — Saint Paul

ADA pedestrian ramps and sidewalks improvements along St. Anthony Ave. and Concordia Ave. between Western Ave. and Hwy 280 in St. Paul

  • Status: Complete

I-94 — Saint Paul

Construct or repair a noise wall and install landscaping between Prior Avenue and Fairview Avenue

  • Construction: August 2021 through June 2022
  • Traffic impacts: Possible lane, ramp and shoulder closures

I-94 — Saint Paul

Updated pedestrian ramps at various locations to meet current accessibility standards from Cretin Avenue/Vandalia Street to Western Avenue and Fairview Avenue

  • Status: Complete

I-94 — Saint Paul

Install landscaping from Pascal Street to Mackubin Street

  • Construction: August 2021 through June 2022
  • Traffic impacts: Possible lane, ramp and shoulder closures

I-94 — Saint Paul

Improved accessibility and signals along the frontage road from Cretin Avenue to Griggs Street

  • Status: Completed

I-94 — St. Paul standalone noise barrier

Construct a new wood plank and concrete post noise barrier on eastbound I-94 between Fairview Avenue and Prior Avenue in St. Paul.

  • Construction: August 2021 through June 2022

I-94 and I-35E — Saint Paul

Concrete pavement repair/resurfacing between Western Avenue and Mounds Boulevard; and on I-35E between I-94 and University Avenue in St. Paul. Resurface ramps and frontage roads, bridge repair, fix drainage and repair various sidewalks and ADA improvements

  • Construction dates: Summer 2021 through fall 2022

I-94 and I-694 — Brooklyn Center

Resurfaced, concrete pavement repairs, drainage and ADA improvements on I-94/I-694 between Brooklyn Boulevard and just east of Dupont Avenue in Brooklyn Center.

  • Status: Completed

I-94 — Central Minnesota

Future road construction plans for I-94 in Wright and Stearns counties, in central Minnesota. Includes the communities of St. Michael, Albertville, Monticello, Clearwater, St. Cloud, Collegeville and Sauk Centre.

  • Current, future plans and studies

I-94 — Maple Grove to Clearwater

Resurface road, replace/construct bridges, add lanes and improve access

  • Construction: August 2019 to August 2022
  • Impacts: Single-lane closures at off-peak hours. Watch for access or lane changes

Hwy 95 — Woodbury

Resurfaced the road, improved drainage, and updated accessibility to meet current standards from Hudson Boulevard to Valley Creek Road and from Valley Creek Road to the junction of 40th Street/Bailey Road

  • Status: Complete

Hwy 95 — Scandia

Repaired drainage south of Cedar Cliff Road

  • Status: Complete

Hwy 95 — West of Cambridge

Reconstructed 12 miles of Hwy 95 road surface and replaced 16 pipes from Isanti Co. Rd. 15 near Wyanett to west limits of Cambridge, included new roundabout at Hwy 47.

  • Status: Completed

Hwy 97 — Forest Lake

Safety improvements, construct dedicated turn lanes on Hwy 97, and construct a multi-use trail.

  • Construction: 2024 through 2025
  • Traffic impacts: Lane closures or possible full closures

Hwy 99 — Nicollet to St. Peter

Resurfacing 11 miles of Hwy 99 from Birch Street in Nicollet to the south intersection with Hwy 169 in St. Peter

  • Status: Completed

back to top

Hwys 100-199

Hwy 100 — Brooklyn Center

Concrete pavement repair, asphalt resurfacing and bridge deck replacement on Hwy 100 from just south of I-94/I-694 to just west of Dupont Ave. in Brooklyn Center.

  • Status: Completed

Hwy 100 — Edina to Robbinsdale

Repaired or relocated fences.

  • Status: Completed

Hwy 100 — St. Louis Park

Removed diseased, damaged, volunteer and invasive trees and shrubs in area bounded by Hwy 100, 28th Street, Toledo Avenue and 29th Street

  • Status: Completed

Hwy 107 — Braham

Community invited to 'try-out' potential walk, bike opportunities at a demonstration project set-up in Braham, Isanti County. Includes: Curb extensions at Central Dr., narrowed road and parking.

  • Status: Completed

Hwy 108 — Henning

Reconstruct Hwy 108 in Henning, utility replacements, bicycle and pedestrian accessibility upgrades.

  • Scheduled for construction in 2024

Hwy 120 — Maplewood to Oakdale

This study will identify issues, priorities and environmental concerns on Hwy 120 between I-94 in Maplewood and I-694 in Oakdale.

  • Study dates: Summer 2020 through summer 2022

Hwy 123 — Sandstone

Resurfacing Hwy 123 from Hwy 23 to County Hwy 30, and realign Hwy 123 and Hwy 23 intersection

  • Scheduled for construction in 2021-2022

Hwy 135 — Biwabik

Reconstruct Hwy 135 in Biwabik; complete streets improvements

  • Construction dates: July 2020 through spring 2022
  • Traffic impacts: Lane closures, detour

Hwy 156/Concord Street — Saint Paul

Repair and resurface nearly one mile of Hwy 156 between Hwy 52 and Annapolis Street in St. Paul. Work includes new traffic signals at Concord St., ADA improvements and retaining wall repair.

  • Construction: August 2021 through July 2022

Hwy 169 — Belle Plaine to Blakeley Township

Improve or eliminate certain intersections and install a cable median barrier to improve the safety of the corridor on Hwy 169 between Hwy 25 in Belle Plaine and Hwy 19 in Blakeley Township.

  • Construction: Spring through fall 2023

Hwy 169 — Belle Plaine

Belle Plaine Area Plan

  • Study completed 2003; no projects have been funded or planned

Hwy 169 — Jordan

Repaired or replaced drainage structures, or earth retention systems at 173rd Street.

  • Status: Completed

Hwy 169 — Mobility study

Hwy 169 mobility and transit improvements between Hwy 55 in Golden Valley and Hwy 41 in Shakopee, and between Mankato and the Twin Cities Metro area.

  • Study completed

Hwy 169 — Shakopee to Blakely

Identify options for access changes, improvements to safety and mobility

  • Study underway

Hwy 169 and Hwy 47 — Anoka

Repaired and resurfaced approximately 2.5 miles of Hwy 169 between the north end of the Mississippi River bridge to Clay Street in Anoka. Hwy 47 was resurfaced from Pleasant Street to Bunker Lake Road in Anoka.

  • Status: Complete

Hwy 169 — Blue Earth to Elmore

Resurface nine miles of Hwy 169 from Faribault County Road 52 (southern limits of Blue Earth) to the northern limits of Elmore

  • 2022 construction

Hwy 169 — Elk River freeway

Convert three miles of Hwy 169 to a new freeway system through Elk River from Hwy 101/Hwy 10 to 197th Ave, Sherburne County. Corridors of Commerce project.

  • Preliminary design in progress; scheduled for construction in 2022-2024

Hwy 169 — Mankato/North Mankato Corridor Study

A nine-mile corridor of Highway 169 through Mankato/North Mankato is being studied for safety, intersection modifications, traffic flow, pedestrian and bicyclist connections, and alternative roadway designs to develop a long-term vision for future improvements

Hwy 169 — South of Zimmerman

Sherburne County improved access and installed two reduced conflict intersections on Hwy 169 at Sherburne Co. Rd. 19 and Co. Rd. 25.

  • Construction: Completed

Hwy 169 — Saint Louis County

Resurfacing Hwy 169 from Hwy 53 to County Road 26 in Saint Louis County, incudes northbound Hwy 169 ramp

  • Status: Completed

Hwy 169/Hwy 22/Hwy 99 — St. Peter Intersections

To improve safety and traffic flow on the south side of St. Peter, construct dual left turn lanes at the intersection of Hwy 169/Hwy 22 and construct a Restricted Crossing U-Turn (also referred to as an RCUT or J-Turn) at the intersection of Hwy 169/Hwy 99

  • 2023 construction

Hwy 197 — Bemidji

Corridor safety and access management

  • Community Review Panel study (looking for preferred alternative in spring 2021)

back to top

Hwys 200-299

Hwy 210 — Brainerd project study

Study of the Hwy 210/Washington Street corridor between Baxter Drive and Pine Shores Road in Brainerd, Crow Wing County. Results of the study will  inform plans for the future reconstruction project.

  •  Study 2019-2021; plan 2022-2024; scheduled for construction in 2025 or beyond

Hwy 210 — Crosby to Ironton

Reconstructed or resurfaced road and improved pedestrian access from the Cuyuna Regional Medical Center to west of Sixth Avenue in Ironton.

  • Status: Completed

Hwy 210 — Baxter

Improved five miles of Hwy 210 through Baxter between Baxter Drive and Timberwood Drive, Crow Wing County.

  • Plans in progress; projects scheduled for construction 2022 and 2024

Hwy 212 — Carver to Norwood Young America

MnDOT is partnering with Carver County to do preliminary design for 4-lane expansion and environmental documentation.

  • Preliminary design: Continues through 2023
  • Construction is expected in 2024-2025

Hwy 212 — Carver to Cologne

A 4-lane expansion from County State Aid Hwy 11 (where existing 4-lane ends) in Carver to County Road 36 in Cologne. Project work includes upgrading pavement, increasing the travel lanes from two to four, realigning Hwy 212 in Dahlgren Township, creating safer routes to get on/off and across Hwy 212 and creating safer access to local properties.

  • Construction: May 2021 through October 2022

Hwy 212 — Brownton

Construct roundabout at the intersection of Hwy 212 and Hwy 15 near Brownton

  • Scheduled for construction in 2025

Hwy 212 — Glencoe

Construct two J-turns on Hwy 212 in the Glencoe area.

  • Scheduled for construction in 2022

Hwy 212 — Glencoe

Construct roundabout at the intersection of Hwy 212 and Morningside Dr. in Glencoe

  • Scheduled for construction in 2024

Hwy 212 — Sacred Heart

Resurface Hwy 212 with reconstruction in Sacred Heart

  • Scheduled for construction in 2023

Hwy 218 — Blooming Prairie

The Hwy 218 corridor through Blooming Prairie (Fourth Street to Hwy 30) is due for reconstruction in 2024.

  • Scheduled for construction in 2024

Hwy 243 — Franconia Township and Osceola

Designing the reconstruction of the Hwy 243/Osceola Bridge over the St. Croix National and Scenic Riverway, in partnership with the Wisconsin Department of Transportation (WisDOT).

  • Construction: Summer 2025

Hwy 252 and I-94 — Environmental Review

MnDOT, along with FHWA, Hennepin County and the cities of Brooklyn Center, Brooklyn Park and Minneapolis, are preparing an Environmental Impact Statement (EIS) for the Hwy 252/I-94 project. The project partners will address the purpose and need for the project in the EIS document and develop transportation alternatives.

  • Environmental review underway

Hwy 263 — I-90 to Ceylon

Resurface Hwy 263 in preparation for a turnback of the highway to Martin County

  • Scheduled for construction in 2022

Hwy 271 — Hendricks

Resurfacing of Hwy 271 from the junction of Hwy 19 to the MN/SD border

  • Status: Completed

Hwy 280 and Broadway Street — Lauderdale

Close the median crossing, remove the northbound left turn lane and traffic signal system and extend the median barrier. This will eliminate traffic movements from northbound Hwy 280 to westbound Broadway Street.

  • Construction: Spring through summer 2024

Hwy 287 — Long Prairie

Community invited to try-out potential walk, bike opportunities at a demonstration project set-up in Long Prairie, Todd County. Includes: Multi-use trail, curb extensions and narrowed road.

  • Status: Completed

back to top

Hwys 300-694

Hwy 316 — Hastings

Reconstruct Hwy 316 between the north junction of Hwy 61 and Michael Avenue

  • Construction: May 2021 through spring 2022

Business Hwy 371 — Barrows to Brainerd

Reconstruct the road, upgrade the signal and improve pedestrian access  from Greenwood Street to Joseph Street in Brainerd; Resurface road from 70th Avenue in Barrows to Greenwood Street. Work requires detours.

  • Scheduled for construction in 2022

Hwy 371 — Brainerd Lakes area

Improve access and safety at three intersections along a busy stretch of Hwy 371 with use of Reduced Conflict Intersections (RCI) between Gull Lake Dam Road (Crow Wing County Road 125) and Green Gables Road (Crow Wing County Road 126), includes access to Birchdale Road (Brainerd International Raceway).

  • Plans in progress; scheduled for construction in 2022

Hwy 371 — Hackensack

Reconstruct Hwy 371 from County Road 40 to County Road 5 in Hackensack.

  • Community outreach, information gathering and project development

Hwy 371 — Nisswa to Pine River project study

Project study to expand to four lanes and improve access along the corridor. Since the study was completed, Hwy 371 has been expanded to four lanes between Nisswa and Jenkins. Pine River to Jenkins remains unprogrammed for expansion.

  • Status: Study completed

I-394 and I-94 — Minneapolis

Repair bridge joints and resurface ramps connecting I-94 and I-394 to downtown Minneapolis.

  • Construction: April 2021 through spring 2022

I-494 — Airport to Hwy 169

Study to evaluate design alternatives and determine a scope of work for the future reconstruction of the I-494 corridor from the MSP Intl' Airport to Hwy 169. The proposed project is envisioned to improve the capacity of the interstate and dramatically improve the reliability of the average rush hour trip.

  • Study underway; scheduled for construction in 2022-2024

I-494 — Richfield

Build tunnel under I-494 at Knox Avenue for Orange line bus rapid transit.

  • Construction dates: August 2019 to December 2021
  • Traffic impacts: Closure of ramps from southbound I-35W to westbound I-494 and from eastbound I-494 to southbound I-35W

I-494 and Hwy 62 — Congestion relief study

Mobility and transit improvements

  • Status: Study completed

I-494 and I-694 — Woodbury to Oakdale

Install landscaping on I-694 from 10th Street to I-694/494/94 junction and on I-494 from I-694/494/94 junction to Tamarack Road

  • Construction: August 2021 through November 2023
  • Traffic impacts: Possible lane and shoulder closures

I-535 – Blatnik Bridge

Replacement of the Blatnik Bridge between Duluth, Minn., and Superior, Wis.

  • Scheduled for construction in 2027

Hwy 610 — Coon Rapids

Replaced the signal and updated accessibility to meet current standards at Coon Rapids Boulevard

  • Status: Completed

I-694 — New Brighton

Repaired noise wall along the south side of I-694 between Silver Lake Road and Long Lake Road

  • Status: Complete

I-694 — Oakdale to Maplewood

Concrete road repaired on I-694 between 10th Street in Oakdale and Hwy 61 in Maplewood

  • Status: Complete

I-694 — Vadnais Heights/White Bear Lake to Oakdale

Installed lighting from Hwy 61 in Vadnais Heights/White Bear Lake to County Road 10 in Oakdale

  • Status: Complete

I-694 and I-494 — Woodbury to Oakdale

Install landscaping on I-694 from 10th Street to I-694/494/94 junction and on I-494 from I-694/494/94 junction to Tamarack Road

  • Construction: August 2021 through November 2023
  • Traffic impacts: Possible lane and shoulder closures

ADA improvement project

Improvements to sidewalks, ramps and driveways to meet current ADA standards on multiple highways.

  • Construction dates: April – November 2021

Bridges – Highways 11, 89, 9 and 32 bridges

Repair 4 bridges: Hwy 9 bridge over Marsh River south of Ada, Hwy 11 bridge over Silver Creek east of Baudette, Hwy 32 bridge south of Greenbush, Hwy 89 bridge over Roseau River northwest of Roseau.

  • Scheduled for construction in 2021

Metro Wide — St. Louis Park, Arden Hills and Shoreview

Applied a thin surface treatment on Hwy 7 between Texas Avenue and Hwy 100 in St. Louis Park, and on Hwy 10, 51 and I-694 interchange area in Arden Hills and Shoreview.

  • Status: Complete

Metro Wide — Saint Paul, White Bear Lake, South Saint Paul, Eden Prairie and Cologne

Apply a thin surface treatment on Hwy 5 from Excel Energy Center to St. Clair Ave. in St. Paul. On Hwy 61 from Keller Lake to County Road 65 in White Bear Lake. On Hwy 3/South Robert Street from Mendota Road to Annapolis Street. On Hwy 212 from I-494 to Hwy 62 and on Hwy 284 from Hwy 212 to Hwy 5 in Cologne.

  • Construction: June 2021 through June 2024
  • Traffic impacts: Possible lane and shoulder closures

Metro Wide — Mendota, Minneapolis, Maplewood and Woodbury

Repair concrete road surface on Hwy 62 from the west end of the Mendota Bridge to Hwy 5. On Hwy 55 from Hiawatha to I-94. On I-694 from Hwy 61 to Hwy 36 and on I-494 from Tamarack Road to Lake Road.

  • Construction: May 2021 through June 2022
  • Traffic impacts: Possible lane, shoulder and ramp closures with possible detours

Plymouth Avenue — Minneapolis

The Plymouth Avenue bridge over I-94 in Minneapolis will get a new driving surface and the nearby intersection at Plymouth Avenue and Third Street will get improved sidewalks, ramps and signals.

  • Construction: May through July 2023

Stone Arch Bridge — Minneapolis

Preservation of the historic bridge including repointing mortar and repairing/replacing some of the stone

  • Scheduled for construction in 2022-2024

Urban freight perspectives study — Metro district

The Urban Freight Perspectives study is focused on enhancing freight mobility in MnDOT's Metro District by improving communication with freight stakeholders and integrating freight considerations into the district's project development process.

  • Study dates: April 2020 through fall 2021

back to top

Source: https://www.dot.state.mn.us/roadwork/index.html

Posted by: davidrons1t9360.blogspot.com